Quick Answer: Standard reference: Ontario Health Protection and Promotion Act. A 40ft High Cube One-Trip container makes a fully code-compliant restaurant kitchen in Ontario once you frame it out, run a commercial hood with makeup air, install NSF wall panels and food-grade flooring, hook up water and waste, and pass your local public health inspection. A turnkey single-container build is driven mostly by the conversion scope, the permits, and the utility hookups, not by the box itself. A multi-container build with seating and a propane bar costs more again because every added container multiplies the framing, the services, and the foundation work. The container is the cheapest part. The hood, the kitchen equipment, and the hookups are where the money goes. Tell us your delivery address and we will quote real costs, no anchored numbers, just honest pricing.
In This Guide
- What are the three types of shipping container restaurant in Ontario?
- In what order do you build out a container restaurant?
- What does a public health inspector check in a container restaurant?
- What foundation and utility hookups does a container restaurant need?
- Which container size and grade is best for a restaurant?
- What drives the cost of a 40ft container restaurant build?
- What do first-time container restaurant operators wish they knew?
- FAQs
Reading Time: about 18 minutes
A shipping container restaurant is not a smaller restaurant. It is a normal restaurant that happens to live inside a 320 square foot steel box instead of a 1,500 square foot leased storefront. Every piece of code, every CFIA-aligned food safety rule, every Ontario Public Health Unit inspection checkpoint applies to the container the same way it applies to a strip-mall kitchen. The container does not change the rules. What the container changes is the build sequence, the timeline, and the capital exposure. The same envelope can serve pop-up retail, site offices, or residential conversions; restaurants are simply the most regulation-heavy variant.
Van Blanc has been delivering food-service containers across Ontario since 1995. Most restaurant builders buy a 40ft One-Trip High Cube because the extra 30 cm of headroom matters when a contractor is sandwich-panelling the ceiling and dropping a 4-foot hood underneath. Come walk our Brantford yard, pick the exact container you want, and we will deliver it on a tilt-deck or HIAB anywhere in southern Ontario in 1 to 3 business days.
This article walks through the three scales of container restaurant we have delivered for the last decade (food kiosk, full restaurant, multi-container concept), the actual build sequence in the order it has to happen, what your public health inspector is going to look at when they walk through the door for the pre-opening visit, and the real Ontario cost stack with no waved-off numbers.
What are the three types of shipping container restaurant in Ontario?
Shipping container restaurants in Ontario come in three scales: a 20ft food kiosk with a serving window and no seating, a 40ft full restaurant with a working kitchen, and a multi-container concept arranging two to four 40ft boxes into kitchen, bar, and seating. All three follow identical food-safety code and differ mainly in build cost and the container underneath.
Container restaurants in Ontario fall into three rough buckets. They share the same code requirements but they have very different build costs, very different operator profiles, and very different containers underneath. Paul LeBlanc, who founded Van Blanc in 1995 and has spent 19 years in the container trade, puts it plainly: “People walk in asking what a container restaurant costs. The honest answer is it depends which of the three you are building, because the box is the same cheap steel in all three. The kitchen is what costs money.” His son Christian works the Brantford yard with him and walks restaurant buyers through the row before they commit.
Scale 1: The 20ft food kiosk
A 20ft High Cube One-Trip container with a serving window, a small prep counter, a four-burner range, a fryer, a counter cooler, and a hood. Cash-only or POS-with-tablet. No seating inside the box. Customers order at the window. Common for ice cream stands at marinas, fish-and-chips at conservation areas, coffee kiosks at industrial parks, and seasonal patio bars at golf clubs. The whole footprint is 160 square feet inside the box.
The container itself is the smallest line on a kiosk build, and it shifts only slightly depending on whether you want grey, blue, or a specified factory colour. The conversion (windows, door, framing, electrical, plumbing, hood, equipment, NSF panels, fire suppression) is the larger share and moves with the equipment grade you choose. Much of that cutting and welding happens at our yard before delivery; the full range of modifications we build in-house covers windows, doors, venting, and roll-up service openings. Permits and hookups add a smaller fixed layer on top. The hood and the equipment, not the steel, set the total.
Scale 2: The 40ft full restaurant
A 40ft High Cube One-Trip container with a full kitchen at one end, a small counter or seating bar at the other end, and a covered patio outside. Capacity for two cooks and a dishwasher on the line. Three to six counter seats inside, more on the patio. This is the most common standalone container restaurant we deliver in Ontario. Burger joints, taco stands, pizza shops, sushi counters, ramen bars.
On a 40ft One-Trip High Cube the box is still the cheapest element. The conversion, the permits, and the hookups stack on top of it, and the total climbs well above a kiosk because the kitchen is bigger and busier. The variance is driven mostly by hood size, fire suppression complexity, and whether you are running gas or all-electric.
Scale 3: The multi-container concept
Two to four 40ft High Cube One-Trip containers arranged in an L, U, or courtyard layout. One container is the kitchen, one is the bar, one is back-of-house, sometimes one is the cold storage and washroom block. Indoor seating in the centre or on a covered deck. These are the container builds you see at Toronto Stackt Market, Ottawa container villages, and growing now in Hamilton, Kitchener, and Brantford.
Buying the four boxes is the easy part of the budget. The conversion is where a multi-container concept gets expensive, and the finish level is the biggest swing, whether you keep the industrial-look exposed steel or wrap the whole thing in cedar and plaster. Permits, the larger foundation, and the multiplied hookups push the total to several times a single-container build. Plan the project around the conversion and the services, not the containers.
Why One-Trip and not Wind & Water Tight
Almost every container restaurant we have delivered in Ontario started life as a One-Trip High Cube. A Wind & Water Tight (WWT) container is structurally fine, but it has paint chips, surface rust, a dozen patch welds inside, and corner-cast scuffs that the public health inspector and the customers are both going to notice. Spending the extra to get a One-Trip is the cheapest insurance you will ever buy on a restaurant build. The container shows up looking like new. The interior is dry, dent-free, and ready for framing the day it lands.
In what order do you build out a container restaurant?
A container restaurant build runs in a fixed sequence, and the project goes sideways when the trades show up in the wrong order. The framer cannot finish until the rough openings for the hood vent, exhaust fan, makeup air unit, washroom vent, and service window are cut. The electrician cannot land panel until the framer is done. The plumber cannot rough-in until the floor is opened up. The NSF wall panels cannot go up until everything in the wall is final. This is the sequence that works.
Step 1: Container arrives and gets levelled
The container lands on your prepared foundation (gravel pad, concrete footings, or piers depending on permanence). It gets levelled to within 1 cm front-to-back and side-to-side. This matters. A container that is not level will cause your floor drain to back up, your dishwasher to drain wrong, and your fryer to sit at an angle that affects oil safety.
Step 2: Rough openings cut
Service window, customer door, washroom door, kitchen exhaust riser, makeup air intake, washroom exhaust, electrical service entry. All of these get cut with a plasma torch or a magnetic-drive cold saw and reinforced with welded steel angle iron around every opening. Our windows and personnel doors guide walks through the welded-frame detail. Anyone telling you they will cut with a grinder and skip the angle iron is cutting corners. The corten steel of a shipping container is structural. You take out a window opening and put nothing back, the wall starts to oilcan and the door frames go out of square.
Step 3: Electrical service and rough-in
A full kitchen container typically needs 200 amp 240V single-phase service. A multi-container build usually needs 400 amp split into two panels. The electrician lands the panel, runs all branch circuits inside steel conduit (not romex, inspectors in Ontario will fail a romex install inside a container), and roughs in for hood lights, makeup air controller, fire suppression panel, fryer, range, grill, fridge, freezer, dishwasher, water heater, and POS.
Step 4: Plumbing rough-in
Three-compartment sink for wares, separate handwash sink (mandatory and physically separate from the prep sink under Ontario food premises rules), prep sink, mop sink. A floor drain in the kitchen area is preferred but not always required by your specific Public Health Unit (ask early, this varies by municipality). Hot water tank sized for at least a 45-degree minimum holding temperature with enough capacity for the warewashing volume. Grease interceptor under the three-compartment sink. Backflow preventer on the supply line. Septic or municipal sewer connection at the back.
Step 5: Hood, exhaust, and makeup air
This is the most expensive single line item in a container restaurant. A Type 1 grease hood for cooking that produces grease-laden vapours (range, grill, fryer, charbroiler) for a 4ft to 8ft hood. The exhaust fan. Fire suppression (ANSUL R-102 or equivalent wet chemical system tied into a gas shutoff and a manual pull station). Make-up air is mandatory in any commercial kitchen that has a hood removing more than about 400 CFM. The makeup air unit costs more when you need a heated unit for winter operation, and in Ontario you do. The installed hood-and-vent system is consistently the single largest line on the build, driven by hood size, the fire suppression package, and whether the makeup air is heated.
The hood vent has to terminate at least 10 feet from any property line and at least 10 feet from any air intake (including your own makeup air intake). It has to discharge upward or horizontally with a NFPA-96-compliant terminal. Anyone telling you they will just cut a hole in the side and put a 12-inch dryer vent up has built you a fire hazard, not a restaurant.
Step 6: Framing, insulation, vapour barrier
Steel stud framing on the inside of the corten walls. Closed-cell spray foam insulation (R-20 to R-24 in the walls, R-30 to R-38 in the ceiling) sprayed onto the steel. This handles thermal bridging, condensation, and the noise of rain on the metal roof. Our deeper guide to shipping container insulation for Ontario climate covers spray foam vs rigid panel and the R-value math. A polyethylene vapour barrier behind the framing is critical in Ontario. The temperature delta between a -25C January and a +35C August will hammer any container envelope that has not been vapour-controlled. We have seen first-build container restaurants in Ontario drip from the ceiling in the third week of operation because they skipped the vapour barrier.
Step 7: NSF wall panels, flooring, ceiling
Fibre-reinforced plastic (FRP) panels on the walls, NSF-certified, sealed with NSF-listed silicone at every seam. Quarry tile or smooth epoxy on the floor with cove base up the wall 100 mm for cleanability. NSF-rated ceiling panels (or sealed drywall with food-grade paint, depending on your inspector’s preference). The seams matter. The inspector will run a fingernail along the silicone bead at the floor-wall junction looking for gaps where moisture could pool and bacteria could colonize.
Step 8: Equipment install and commissioning
Range, grill, fryer, fridge, freezer, prep tables, dishwasher, water heater, mop sink, handwash sink, three-compartment sink. Hood gets tied into fire suppression. Gas piping gets pressure tested. Electrical gets megger-tested. Plumbing gets pressure tested. Fire alarm and CO detection get commissioned. Then the inspections start.
Common build-sequence mistake we see
Buyers try to save money by cutting the rough openings AFTER the framing is done. The framer leaves wood-blocked openings, then the steel guy comes back to cut. The grinder sparks set the spray foam on fire. It happens. Order the rough openings cut BEFORE anything goes inside the container. Steel work first, framing second. Always.
What does a public health inspector check in a container restaurant?
A public health inspector checks a container restaurant against the same food-premises standards as any storefront kitchen. Your local Ontario Public Health Unit inspector is going to do a pre-opening inspection. They are not trying to fail you. They are trying to confirm 11 things. If all 11 check out, you get your permit to operate. If any one fails, you fix it and they come back. Here is what they are checking, in roughly the order they walk the kitchen.
1. Handwash sink location and supply. They want to see a dedicated handwash sink with hot and cold running water, soap dispenser, single-use paper towels. The sink must be in or immediately adjacent to the food prep area. Not in the washroom. Not in the dish pit. A separate, dedicated handwash sink.
2. Three-compartment sink and warewashing setup. Either a three-compartment sink for wash-rinse-sanitize or a commercial dishwasher that runs hot enough (71C minimum final rinse) or sanitizes chemically. They will ask to see the test strips for sanitizer concentration.
3. Refrigeration thermometers. Every fridge and every freezer needs a working thermometer visible to staff. Fridges 4C or below, freezers -18C or below. They want to see the thermometers and they want to know how staff are logging temps.
4. Hot holding and cold holding capacity. If you are running buffet items or pre-prepped foods, your hot hold has to keep food above 60C and your cold hold below 4C. The inspector might bring a probe thermometer and test your steam table or fridge during the inspection.
5. Surfaces and seams. Walls, floors, ceilings, prep tables. Smooth, non-absorbent, durable, easily cleanable. Sealed seams. No exposed wood in food prep areas. No exposed insulation. No fabric porous to grease.
6. Hood, exhaust, and fire suppression. They will look at the hood permit, the fire suppression certificate, and the most recent service tag on the ANSUL system. If you have not had your fire suppression inspected and certified by a licensed contractor, you do not open.
7. Pest control and waste management. Sealed garbage cans, lids, scheduled pickup. No gaps under doors or around utility penetrations where rodents could enter. If the inspector sees a half-inch gap under your service door, that is a fail.
8. Washroom for staff. Either inside the container or in a connected unit. Hot and cold water, soap, paper towels, sign reminding staff to wash hands. Separate from the food prep area.
9. Food safety training certification. At least one certified Food Handler on each shift. They will ask for the Food Handler card or training certificate.
10. Water and waste handling. They want to know your water source (municipal preferred, but well or hauled tank is allowed with extra testing requirements). They want to see your wastewater plan (municipal sewer, septic, or holding tank with documented pump-out schedule).
11. Operating procedures and HACCP-aligned protocols. Cleaning schedule posted, sanitizer concentration logged, allergen procedure documented, employee health policy in place. They are looking for evidence that you have a system, not just a kitchen.
“The container restaurants that pass inspection on the first walkthrough are the ones where the operator spent two days walking the build with their inspector before opening day. The inspector tells you what they will look at, you fix anything they flag in advance, and the official inspection becomes a formality. The ones that fail are the ones who skipped that pre-walk and tried to argue with the inspector on opening day.”
Christian LeBlanc, second-generation operator at Van Blanc Ent. Inc.
What foundation and utility hookups does a container restaurant need?
A container restaurant needs a level foundation (gravel pad, concrete piers, or a slab) plus water, waste, and electrical hookups, and the hookups are where first-time operators get surprised. The container itself is straightforward. The conversion is well-understood. The thing that catches first-time container restaurant operators in Ontario is the foundation and the utility hookups. Three patterns we see across the province.
Pattern A: Owned land, municipal services, easy build
Operator owns a small lot in a serviced commercial corridor. Water tap is available at the curb. Sewer is available. Electrical service is a Hydro One or local utility hookup with a transformer already at the road. Gas is at the property line if you are running propane or natural gas. This is the easiest scenario. Foundation is six concrete piers or a slab. Permits are straightforward. The hookup and foundation layer is the lowest of the three patterns because the services are already at the lot line and the foundation is simple.
Pattern B: Leased pad, shared utilities
Operator is on a leased pad inside a container market, a brewery courtyard, or a seasonal pop-up location. Water, sewer, and electrical come off the host site’s mains with separate sub-meters. The operator’s exposure here is the meter installation and the tie-in fees, which are usually modest because the host site already carries the mains. Lease costs are separate.
Pattern C: Rural location, no services, hauled water
Conservation area, marina, golf course on rural land. No municipal water. No sewer. Power is the only easy thing because Hydro will run a service drop. You will need a potable water holding tank, a wastewater holding tank with a documented hauler contract, and propane for cooking. Your Public Health Unit will want extra documentation. The foundation, services, holding tanks, and propane stack are the most expensive of the three patterns because you are building the utilities a serviced lot already has, plus ongoing pump-out costs once you open.
The one piece of advice we give every operator before they sign the container deposit: confirm your water, waste, and power plan for the exact spot the box will sit before you commit to the site. A 15 minute conversation with your Public Health Unit about your water source and wastewater handling saves a lot of grief later. Tell us your delivery address and we will help you scope the container and the delivery so the box that lands is the right one for that site.
Which container size and grade is best for a restaurant?
The best container for an Ontario restaurant is a 40ft One-Trip High Cube, and the most common one we deliver to restaurant builders is exactly that. Here is why each of those specs matters.
40ft length. A 20ft container is fine for a kiosk with no seating, but a 40ft is a real working kitchen. You can put a 4-foot grill, a 6-burner range, a fryer, a 48-inch undercounter cooler, a 24-inch reach-in freezer, a prep table, a three-compartment sink, a handwash sink, and a service counter inside a 40ft. You cannot do that in a 20ft. Compare the math in our 20ft vs 40ft cost-per-cubic-metre breakdown before committing.
High Cube. A standard container is 2.59 m external height (8’6″). After you drop a 100 mm spray foam ceiling and a 4-foot Type 1 hood, you have about 1.85 m of usable headroom. That is shorter than most cooks. A High Cube at 2.90 m external (9’6″) gives you 2.15 m usable. The 30 extra centimetres is the difference between a cramped kitchen and a workable one. See our High Cube vs Standard analysis for the full case.
One-Trip. A Wind & Water Tight (WWT) container looks cheaper at purchase, but it costs you two weekends of grinding, patching, repainting, and de-rusting before the framer could start. By the time you add that labour, the WWT route usually costs more than the One-Trip would have. And the inspector still raises an eyebrow at the visible repair welds inside the walls. One-Trip arrives clean, dry, dent-free, and ready for trades to start the next morning. For restaurant builds we recommend One-Trip every time, and you can see the current factory-fresh stock we keep on the lot for exactly these projects. Our new vs used grade explainer details when each grade makes sense.
200+ container inventory and you pick your box
Van Blanc carries over 200 containers across our four Brantford yards at any given time. Restaurant operators come walk the row, check the corner casts on the unit they want, look at the floor inside, knock on the walls to listen for hidden patches, and pick the exact container that will become their kitchen. We are the only vendor in Ontario that lets buyers walk the row and pick their box. Other suppliers send you a stock photo and dispatch from a depot you have never seen. Restaurant builds are too expensive to roll the dice on whatever container shows up. Come see the yard before you buy.
What drives the cost of a 40ft container restaurant build?
The cost of a 40ft container restaurant is driven by the hood, the kitchen equipment, and the utility hookups, not by the container, which is the smallest line on the build. Here is the line-by-line breakdown for a typical 40ft One-Trip High Cube container restaurant in southern Ontario, delivered, converted, hooked up, and ready to open. Instead of anchoring you to a number, the table below shows how heavily each line weighs on the total and what pushes it up or down in the mid-2026 Ontario market.
| Line item | Relative share of the build | What moves it up or down |
|---|---|---|
| 40ft One-Trip High Cube container | Small | Grade (One-Trip vs WWT), colour, and the steel market at time of order |
| Delivery within 200km of Brantford | Small | Distance from the Brantford yard, site access, and tilt-deck vs HIAB placement |
| Foundation (piers or pad) | Small to moderate | Piers vs full slab, soil conditions, and how level the site already is |
| Steel work, openings, reinforcement | Moderate | Number of cut openings (window, doors, hood riser, vents) and welded angle-iron reinforcement |
| Framing, insulation, vapour barrier | Moderate | Closed-cell spray foam R-value and the vapour-control detailing for Ontario winters |
| Electrical service and rough-in | Moderate | 200 amp vs 400 amp service and the number of equipment circuits in steel conduit |
| Plumbing rough-in and hookups | Moderate | Sink count, grease interceptor, hot-water capacity, and municipal vs septic or hauled water |
| Hood, exhaust, makeup air, suppression | Largest | Hood type and length, fire suppression complexity, and heated makeup air for winter |
| NSF wall panels, flooring, ceiling | Moderate | FRP coverage, quarry tile vs epoxy floor, and the linear metres of sealed cove base |
| Kitchen equipment (range, grill, fryer, fridge, freezer, prep) | Large | New vs used equipment and gas vs all-electric line |
| Service window, doors, finishes | Small to moderate | Window size, personnel-door count, and interior finish level |
| Permits, inspections, drawings | Small | Municipality, stamped-drawing requirements, and Public Health Unit conditions |
| Total turnkey | 100% | Hood, equipment, and hookups dominate; the container is the smallest share |
The hood-and-vent line is the single biggest variable. A small electric kitchen with no fryer and no charbroiler can get by with a lighter Type 2 hood. A full gas line with a 6ft Type 1 hood, suppression, and heated makeup air for winter operation costs several times as much. Decide your equipment list before you commit to your hood spec, not after.
What do first-time container restaurant operators wish they knew?
First-time container restaurant operators in Ontario consistently wish they had planned for four things: winter heat loss, the noise of steel, the grease-trap pump-out schedule, and the simple fact that the container outlasts the business inside it.
Winter operation matters. A 40ft container in February will lose heat fast through any uninsulated penetration. Spec your hood makeup air with a heating element. A cold makeup air dump straight onto the line will make your cooks miserable and your fryer oil flash colder than the recipe expects.
Noise carries. The corten steel rings. If you are running a busy kitchen with a hood at 600 CFM, the acoustic environment is brutal until you put the spray foam and the wall panels up. Plan for a temporary acoustic ceiling during the trade phase if you have crews working overhead.
Grease trap pump-out schedule. A small grease interceptor needs pumping every 60 to 90 days under normal volume. A busy lunch service may push that to every 30 days. Build the recurring pump-out into your operating budget and line up a hauler before you open.
The container will outlast the restaurant business it houses. A One-Trip High Cube has a 25 to 35 year service life with normal maintenance. Our full shipping container lifespan guide walks through Corten chemistry and the four corrosion accelerants that actually shorten service life. The restaurant concept inside it might last 3 years. The container is an asset. When the concept changes, you re-skin the interior and run something else. The box is forever.
Frequently asked questions
How long does it take to build a container restaurant from container delivery to opening day?
From container delivery to first paying customer, plan for 12 to 20 weeks for a single-container build. Steel openings and framing: 2 to 3 weeks. Electrical and plumbing rough-in: 2 weeks. Hood and suppression install: 2 to 3 weeks. NSF surfaces and finishes: 2 weeks. Equipment install: 1 week. Inspections and final fixes: 2 to 4 weeks. Permits before the container arrives can add another 4 to 12 weeks depending on municipality. Total project length from concept to opening: 5 to 8 months.
Is a shipping container restaurant cheaper than a traditional restaurant build?
Yes, generally 25 to 45 percent cheaper for a comparable kitchen size, mostly because the building envelope is already built. A traditional 40ft x 25ft kitchen built from scratch in Ontario carries the full cost of the shell, foundation, and basic finishes before any equipment goes in. A 40ft container restaurant folds the envelope, the foundation, and the structural framing into a much smaller number, even with equipment included. The kitchen-equipment costs themselves are identical between the two.
Can you use a Wind & Water Tight container instead of One-Trip?
You can, but we do not recommend it for restaurants. A Wind & Water Tight (WWT) container is the grade just below cargo-worthy: weather-tight and rodent-proof, but it carries surface rust, patch welds, and paint variance. It is cheaper to buy, but it costs 30 to 60 hours of labour in patching, grinding, repainting, and rust treatment before trades can start. By the time you account for that labour, WWT usually ends up more expensive than One-Trip, and the inspector still notices the repair welds inside the walls. For a food build where surfaces have to read clean, One-Trip is the cheaper grade once the whole picture is counted.
Can I run the restaurant on propane instead of natural gas?
Yes. Propane is the most common fuel for container restaurants in Ontario because rural locations and pop-up sites often have no natural gas service. The propane install is straightforward: a TSSA-licensed gas fitter sets the tank pad, runs the line through a regulator, lands at your equipment connections. Plan your budget for the full gas stack, including a 420lb or 500lb tank.
Can a container restaurant be moved to a new site later?
Yes. A 40ft container restaurant can be disconnected from its services and trucked to a new Ontario site, which is something a built-in-place restaurant cannot do. Moving an already-placed container is a job for a third-party hauler you arrange separately, not part of what Van Blanc does; our work is selling and delivering the container you buy. If you think you may relocate later, keep the foundation simple and the service tie-ins easy to disconnect. Operators who outgrow a seasonal spot or want to test a second concept keep the steel asset and rebuild the interior.
What is the most common mistake first-time container restaurant operators make?
Under-spec’ing the hood and makeup air. Buyers focus on the container, the equipment, and the finishes. The hood is the most expensive single line item and the one most likely to cause an inspection failure if it is wrong. Spec the hood first, equipment second, container third. If the budget runs short, cut elsewhere. Never cut hood spec.
Pick your container in person at our Brantford yard
If you are about to commit a serious capital budget to a container restaurant build, you should see the container before you buy it. Browse what we currently have ready to buy and deliver, then come walk the row in person. Van Blanc has been delivering containers across Ontario since 1995. Our four Brantford yards carry over 200 containers at any given time, including a deep stock of 40ft One-Trip High Cubes in grey, blue, and factory-painted finishes. You walk the row, check corner casts, look at the floor, knock on the panels, and pick the exact unit that will become your restaurant.
We are not a Facebook ad with a stock photo and a wire-transfer request. If you want to know how that fraud actually plays out, we broke down the warning signs in our guide to spotting and avoiding container fraud. We are the family business that has been doing this in Brantford for 30 years, with Paul LeBlanc and his son Christian on the yard most days. Our pricing is COD-honest. Our delivery is 1 to 3 days across Ontario from Brantford. Our inventory is what you see. Come walk the yard.
Building a container restaurant in Ontario?
Call Paul or Christian at 519-754-6844 or come walk the yard at 90 Morton Ave. East, Brantford. We will help you pick the exact container that will work for your build and arrange 1 to 3 day delivery anywhere in southern Ontario.
Ready to price your container?
Tell us the size and your postal code and we’ll send back an honest, all-in number, container, delivery, and placement, usually within 1-3 days. No pressure, no mystery fees.